EX-02

Working

Excavator · Caterpillar 349 (2013) · 15,796 h · Scroggie Creek

Last seen 06:01:56

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-2
Operator Kellie Bashirian

Wash plant

s-scr-wp2

Hours today

9.8 h

Cycle time

28s

Cycles today

912

Engine hours

15,796 h

Next service

in 250 h

Telemetry
Live readings

Engine speed

1,728rpm

Coolant

90.7°C

Hydraulic oil

74°C

Hydraulic pressure

316bar

Bucket fill

90%

Fuel burn

59.3L/h
Fuel
Tank level
38%

472 L

In tank

59.3 L/h

Burn

7.9 h

Range

Utilisation
Hours on this shift

9.8 h

of a 12 h shift · 82% utilisation

Load

90%

Engine speed

1,728 rpm

Coolant

91 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %