Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

39.3 MW

Load factor

53 %

Energy today

181 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

8.7 m/s SSE

Irradiance

0 W/m²

Temperature

14.8 °C

Cloud cover

68 %

Conditions

Partly cloudy

Substation

Mesón SE 220 kV

Voltage

219.3 kV

Frequency

50.023 Hz

Power factor

0.992

Curtailment

19 %

Day-ahead price

73.54 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
32%

Output

1.98 MW

Today

10.7 MWh

Wind

9.0 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
15%

Output

0.62 MW

Today

13.2 MWh

Wind

7.3 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
2%

Output

0.15 MW

Today

15.8 MWh

Wind

5.2 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
94%

Output

4.68 MW

Today

11.9 MWh

Wind

13.9 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
36%

Output

2.23 MW

Today

19.5 MWh

Wind

9.3 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
90%

Output

4.51 MW

Today

10.3 MWh

Wind

13.9 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
47%

Output

1.99 MW

Today

5.6 MWh

Wind

14.6 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
100%

Output

6.20 MW

Today

18.8 MWh

Wind

13.2 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
98%

Output

6.09 MW

Today

21.3 MWh

Wind

13.0 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
88%

Output

5.47 MW

Today

16.7 MWh

Wind

11.9 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
25%

Output

1.27 MW

Today

10.3 MWh

Wind

8.3 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

8.5 MWh

Wind

7.0 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
92%

Output

3.84 MW

Today

12.5 MWh

Wind

12.6 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
6%

Output

0.23 MW

Today

5.8 MWh

Wind

7.0 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
51%

Output

2.56 MW

Today

8.7 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
27%

Output

1.37 MW

Today

6.8 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-17 02:10
medium

IGBT temperature high

INV-02· 10-16 19:19
low

Pitch system hydraulic pressure low

WTG-05· 10-16 11:53
low

Yaw misalignment above limit

WTG-07· 10-16 07:34
low